Residents of Ward 31 in Danapur have raised serious allegations regarding the quality of materials used in the construction of a new RCC drain. The matter gained significant attention after a video showing the construction work started circulating on social media. Taking note of the viral footage, the District Magistrate has intervened and ordered a formal inquiry into the project to ensure structural safety.

आपके लिए प्रकाशित: Newborn Found Abandoned in Nawada: Authorities Investigate Possible Illegal Abortion Amid Ongoing Concerns Over Healthcare Practices

Major Concerns Raised by Residents

Local people expressed their dissatisfaction with the ongoing work, claiming that the basic standards for RCC construction were being ignored. According to the residents, the materials used do not meet the quality requirements mentioned in the project tender. The primary issues reported include the following:

  • Use of substandard cement and sand mixture for the drain walls
  • Failure to follow the technical dimensions specified for the project
  • Lack of regular supervision by technical experts at the site

Official Actions and Directives

Following the complaints and the viral video, the District Magistrate directed the Executive Officer of the Danapur Nagar Parishad to conduct a thorough investigation. The Executive Officer visited the area and stated that the contractor has been issued a warning to maintain quality standards. Future steps involve a detailed test of the materials used to decide if the current work needs to be redone or modified.

Serving "जहाँ Indian वहाँ India" Since 2014. I Started News Desk in Early Days of India Internet Revolution and 4G. I write About India for Indians.

Leave a comment

Your email address will not be published. Required fields are marked *