PHE Department Takes Action to Resolve Water Crisis
In an effort to address the water crisis in Sheikhpura caused by the onset of summer, the Public Health Engineering Department has geared up to ensure uninterrupted water supply to the residents. Department officials have mobilized special teams equipped with vehicles to repair faulty pumps in all six blocks of the district.
Special Teams Deployed for Pump Repair
On Monday, the PHE Department dispatched nine teams of mistries to carry out the maintenance work on malfunctioning pumps in the region. The teams, led by Executive Engineer Sanjay Kumar, have been tasked with ensuring that water supply is restored promptly to the affected areas.
Efforts to Provide Access to Clean Drinking Water
The department is working diligently to tighten its grip on the water crisis as the temperatures continue to rise. With a focus on providing clean and safe drinking water to the residents, the PHE Department is leaving no stone unturned to meet the water supply demands in the district.
Commitment to Resolving Water Shortage Issues
As the PHE Department remains committed to resolving the water shortage issues in Sheikhpura, the deployment of special repair teams signifies a proactive approach towards addressing the challenges posed by the summer heat. The concerted efforts of the department aim to alleviate the water crisis and ensure access to potable water for all residents in the district.
शेखपुरा में गर्मी के दस्तक देते ही पीएचईडी विभाग ने पेयजल संकट पर अंकुश लगाने के उद्देश्य से कमर कस ली है। सोमवार को जिले के सभी 6 प्रखंडों के लिए 9 मिस्त्रियों के दलों को विशेष वाहनों से खराब पड़े चापाकलों की मरम्मती के लिए रवाना किया गया। इसके साथ ही पीएचईडी के कार्यपालक अभियंता ने भी इस कार्रवाई में भाग लिया।